Unless otherwise specified, the per diem locality is defined as "all locations within, or entirely surrounded by, the corporate limits of the key city, including independent entities located within those boundaries." Traveler reimbursement is based on the location of the work activities and not the accommodations, unless lodging is not available at the work activity, then the agency may authorize the rate where lodging is obtained. G3010: Water Supply & Distribution Systems Level of Detail (LOD) and Model Component Author (MCA)Įlement (ASTM Uniformat II Classification)į1050: Special Controls & Instrumentation Assignment of disciplines (if in question) must be finalized as part of the BEP. In many cases one firm may have the responsibility of several disciplines. GC - General Contractor and/or trade partners.This may include the reuse and updating of existing BIM data supplied by GSA. When responsibility is assigned, it includes developing the model for both new and existing conditions unless otherwise noted in the project's BEP. When no custom MPM exists, it is expected that the default table outlined below is followed. Depending on the size and scope of the project, a custom MPM may be defined. The Model Progression Matrix (MPM) is intended to define the team members' roles and responsibilities on BIM-enabled projects.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |